One area in need of an overhaul was a toilet block which required completely stripping out, and replacing of the ceiling tiles, lighting, cubicles, toilet stacks, wash basins, flooring and finally decoration.
The other area that needed a makeover was a locker room area which needed 3 offices creating to allow for an increase in teaching staff. New ceilings, lighting, electrics, carpets and the installation of sound proofed walls were all required.